Topic: BOM or cost of ready production
hi joe
I have a question related the cost of ready production,
before to write the question I am explaining you the situation
when I have create the BOM in FA for the Ferro chrome (ready production Fe-Cr) I have put the consumption of raw materials as follows:
1. chrome ore 2.7 ton (per 1 ton of Fe-Cr)
2. metallurgical coke 0.05 ton (per 1 ton of Fe-Cr)
3. etc
I have follow all the steps in FA about the production of 100 ton of Fe-Cr (ready production) and I saw that the consumption of raw material was decreased based on this technological card, but, the consumption given in BOM is how to say a provision of raw materials consumption and not the fact.
the fact will be when we have finished the inventory, let`s say
after the measurement of:
1. chrome ore stock we can say that the consumption for production of 1 ton Fe-Cr (ready production) is not 2.7 ton but 2.8 or 2.5
Question:
1. CAN I DO CHANGES IN BOM ABOUT THE ITEM WHICH ARE PRODUCED?
2. IF YES, WILL BE REFLECTED THIS CHANGES IN GL EVEN THAT THE ITEM PRODUCTION IS PRODUCED AND MAY BE IS SOLD?
3. IF NO, HOW CAN I HANDLE THIS SITUATION ABOUT THE COST OF READY PRODUCTION IN GL?
many thanks, eglis