Topic: Manufacturing Advance Bug with Service Item
I was using Advance Manufacturing.
1) Issued Items (Service type item) to the manufacturing
2) When issuing, you could see that the item (service) has a cost. (Not sure what is the correct behavior, if it should have a cost)
3) After issuing, you could check that no GL entries were done.
So,
I'm not sure what is the normal or correct behavior for this?