Topic: Cost Estimation Sheet
I felt that the Manufacturing Module in FA starting with the basics of BOM and the Assembly / De-Assembling but the starting point of ESTIMATION part is missing before quoting one company.
It's much more fun, when you can discuss your problems with others...
You are not logged in. Please login or register.
FrontAccounting forum → Manufactoring → Cost Estimation Sheet
I felt that the Manufacturing Module in FA starting with the basics of BOM and the Assembly / De-Assembling but the starting point of ESTIMATION part is missing before quoting one company.
Yes, you are right. There is no Estimation System in FA right now.
Is there a way to import a cost estimation spreadsheet?
Provide sample cost estimation sheet and what fields from it need to go into what fields in the which form in FA.
I don't have a cost estimation sheet. I am just exploring. If someone has one already to go I would happily try it out.
There is no cost estimation module available. But you can use the sales quote as estimation.
Will the information flow into the database to be used by the work order module?
Actually it will the other way around. When a form is filled in, it acquires the cost data from the tables and outputs it.
When you do a sales estimate or manufacturing quote you must enter information pertaining to the project in question. This data should flow into the database and subsequently be available for future reports and consideration. All data cannot come from the database as not all information regarding a new project can be in the database before the project is started.
What I meant was for on-the-fly cost estimation. In your case, you would create a separate manufacturing work order and then zero the output and treat it as fulfilled and keep it like a template for future use.
FrontAccounting forum → Manufactoring → Cost Estimation Sheet
Powered by PunBB, supported by Informer Technologies, Inc.
Currently installed 4 official extensions. Copyright © 2003–2009 PunBB.