Topic: Same item, different work centres, different locations
Bonjour all,
I have different work centers and each has specific locations raw materials are taken from. For instance, to produce Item A from Work Center 1, components (raw materials) are taken from Location 1.
To produce the same Item A from Work Center 2, components (raw materials) are taken from Location 2.
In setting up Bill of materials for Item A, I notice I have to select the Location (the source of raw materials). How do I set up Bill of Materials for item A? Can I have more than one Bill of materials for one manufactured item?
Advanced thanks.