Topic: Error in Work Order
Using advanced manufacture I've noticed bugs:
BUG 1 Partial Issue of Component Requirement
--------------------------------------------------------------------------------------------------------------------------------------------------------
I issued 3 units of component to production that requires 5 units of component to produce.
Components issued are not recorded on the work order when viewed or printed.
Conclusion: in this circumstance a work order printed or viewed from Front is not reliable
--------------------------------------------------------------------------------------------------------------------------------------------------------
BUG 2 Incorrect Unit Cost
--------------------------------------------------------------------------------------------------------------------------------------------------------
The advanced manufacture process takes place in the following steps after making a work order:
a) Release the work order
b) Issue the stock
c) Produce the manufactured item
d) Costs (other than inventory) to be allocated to manufactured item
The process of issuing the stock is duplicated in the process of manufacturing the item.
As a result the cost of the material component of the manufactured item is accounted for twice.
The result of this are
i) An incorrect unit cost is shown in the Inventory Valuation Report.
ii) The value of component stock in the GL is understated (as components are removed x2 from the GL but only once in reality on the shop floor)
iii) The value of the finished item stock in the GL is overstated (as components are included x2 in the GL but only once in reality on the shop floor)
Conclusion: Advanced manufacturing overstates unit costs
---------------------------------------------------------------------------------------------------------------------------------------------------------
BUG 3 Incorrect Jnl entries to account for incomplete manufacture (Work in Progress) in advanced manufacturing
---------------------------------------------------------------------------------------------------------------------------------------------------------
The advanced manufacture process takes place in the following steps after making a work order:
a) Release the work order
b) Issue the stock
c) Produce the manufactured item
d) Costs (other than inventory) to be allocated to manufactured item
The journal entry passed to issue the stock sends it to GL for finished goods stock instead of GL for work in progress.
If the manufacturing process is not complete finished goods stock can't be updated.
Conclusion: Front does not reliably show the value of finished goods stock in the GL if there are incomplete work orders.
------------------------------------------------------------------------------------------------------------------------------------------------------
BUG 4 to come - also has to do with partial issue of component stock...the system updates the GL account inventory adjustment (P&L) instead of work in Progress (B/S).
....