1

(1 replies, posted in Manufactoring)

I have 8 cost centers with multiple employees in each cost center. 

Each employee at any one time is multi-tasking many tasks for many clients. 

How can I track in FA: 

Who is on what task for which client

the status of the specific tasks (assigned, pending, in-progress, complete)

and how much time (human and clock hours) is being spent on each task  in total and per employee? 

Thank you.  OfficeMgrBTI@Truevine.net

2

(1 replies, posted in FA Modifications)

I have changed the field's length in the php code, but it still only reads the first 5 and not all that are entered.  I really need the code to accept a longer location.  Help.  Thank you.  We have locations that are for instance HFARGS12B10.  This is coded saying which plant, which room, the storage device, the shelf or drawer and what bin or section.  So when retrieving or storing something, we can go exactly to the proper place.  There is no wasted time scouting for it.

Thank you.

Have a Blessed Day,
OfficeMgrBTI@Truevine.net

3

(1 replies, posted in Items and Inventory)

I have changed the field's length in the php code, but it still only reads the first 5 and not all that are entered.  I really need the code to accept a longer location.  Help.  Thank you.  We have locations that are for instance HFARGS12B10.  This is coded saying which plant, which room, the storage device, the shelf or drawer and what bin or section.  So when retrieving or storing something, we can go exactly to the proper place.  There is no wasted time scouting for it. 

Thank you. 

Have a Blessed Day,
OfficeMgrBTI@Truevine.net