<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
	<channel>
		<title><![CDATA[FrontAccounting forum — Multiple units from single BOM]]></title>
		<link>https://frontaccounting.com/punbb/viewtopic.php?id=8703</link>
		<atom:link href="https://frontaccounting.com/punbb/extern.php?action=feed&amp;tid=8703&amp;type=rss" rel="self" type="application/rss+xml" />
		<description><![CDATA[The most recent posts in Multiple units from single BOM.]]></description>
		<lastBuildDate>Wed, 16 Mar 2022 15:47:35 +0000</lastBuildDate>
		<generator>PunBB</generator>
		<item>
			<title><![CDATA[Re: Multiple units from single BOM]]></title>
			<link>https://frontaccounting.com/punbb/viewtopic.php?pid=40748#p40748</link>
			<description><![CDATA[<p>@kurt I am available to FrontAccounting training if you are interested PM.</p>]]></description>
			<author><![CDATA[null@example.com (dearmosin)]]></author>
			<pubDate>Wed, 16 Mar 2022 15:47:35 +0000</pubDate>
			<guid>https://frontaccounting.com/punbb/viewtopic.php?pid=40748#p40748</guid>
		</item>
		<item>
			<title><![CDATA[Re: Multiple units from single BOM]]></title>
			<link>https://frontaccounting.com/punbb/viewtopic.php?pid=40727#p40727</link>
			<description><![CDATA[<p>@gabbropee I would do an intermediate step:<br />Make 1 coconut head from 1/80 th part of a bag (.0125 I think)<br />Then make 1 pack of chips from 1/60 th part of a coconut head.</p>]]></description>
			<author><![CDATA[null@example.com (kurt)]]></author>
			<pubDate>Tue, 15 Mar 2022 00:17:36 +0000</pubDate>
			<guid>https://frontaccounting.com/punbb/viewtopic.php?pid=40727#p40727</guid>
		</item>
		<item>
			<title><![CDATA[Re: Multiple units from single BOM]]></title>
			<link>https://frontaccounting.com/punbb/viewtopic.php?pid=39945#p39945</link>
			<description><![CDATA[<p>I produce coconut Chips. I produce 60 packs of Coconut Chips from 1 bag of Coconut head which contains 80 coconut heads.</p><p>Please which is the best way to use work order and BOM to achieve this manufacturing.<br />Thank you</p>]]></description>
			<author><![CDATA[null@example.com (gabbropee)]]></author>
			<pubDate>Thu, 26 Aug 2021 20:45:18 +0000</pubDate>
			<guid>https://frontaccounting.com/punbb/viewtopic.php?pid=39945#p39945</guid>
		</item>
		<item>
			<title><![CDATA[Re: Multiple units from single BOM]]></title>
			<link>https://frontaccounting.com/punbb/viewtopic.php?pid=37232#p37232</link>
			<description><![CDATA[<p>I&#039;m using the advanced manufacturing option to try to make a product where we had to adjust our manufacturing process due to an item shortage. Where I would normally use 60 screws to build a case I had to use adhesive (which I won&#039;t add as input, amount used is small and cost insignificant) and only used screws where they were structurally necessary, using only 20 screws. So I want to issue 20 screws to make 1 case which I did but when I process it says screws will go into negative. Have I done wrong or missed a step?<br />I don&#039;t want to make a new BOM or change the original to create this product because this will hopefully not happen again.</p>]]></description>
			<author><![CDATA[null@example.com (kurt)]]></author>
			<pubDate>Mon, 06 Apr 2020 21:48:51 +0000</pubDate>
			<guid>https://frontaccounting.com/punbb/viewtopic.php?pid=37232#p37232</guid>
		</item>
		<item>
			<title><![CDATA[Re: Multiple units from single BOM]]></title>
			<link>https://frontaccounting.com/punbb/viewtopic.php?pid=37084#p37084</link>
			<description><![CDATA[<p>Having explored the &#039;Advance Manufacture&#039; option in the demo it is almost exactly right, I have seen very similar functionality in other packages and it is a very good way to allow for variations in your manufacturing process but it adds a layer of complexity. I think my solution might be to manufacture A as a whole item and then use fractions of that in the manufacture of B etc.<br />I really do appreciate the ability to tweak the manufacturing right at the material issue / allocation stage that will certainly be useful for me.<br />Thanks again Joe.</p>]]></description>
			<author><![CDATA[null@example.com (kurt)]]></author>
			<pubDate>Sun, 01 Mar 2020 16:23:28 +0000</pubDate>
			<guid>https://frontaccounting.com/punbb/viewtopic.php?pid=37084#p37084</guid>
		</item>
		<item>
			<title><![CDATA[Re: Multiple units from single BOM]]></title>
			<link>https://frontaccounting.com/punbb/viewtopic.php?pid=37083#p37083</link>
			<description><![CDATA[<p>So I can do exactly what I propose already?<br />Which is put in x units + y units to obtain z units ?<br />If this is the case thanks and thanks for the quick response.</p>]]></description>
			<author><![CDATA[null@example.com (kurt)]]></author>
			<pubDate>Sun, 01 Mar 2020 12:38:39 +0000</pubDate>
			<guid>https://frontaccounting.com/punbb/viewtopic.php?pid=37083#p37083</guid>
		</item>
		<item>
			<title><![CDATA[Re: Multiple units from single BOM]]></title>
			<link>https://frontaccounting.com/punbb/viewtopic.php?pid=37076#p37076</link>
			<description><![CDATA[<p>FA Advanced Manufacturing does not require a BOM.&nbsp; &nbsp;A, B,C are issues and D is the manufactured item.</p>]]></description>
			<author><![CDATA[null@example.com (Braath Waate)]]></author>
			<pubDate>Sat, 29 Feb 2020 12:44:56 +0000</pubDate>
			<guid>https://frontaccounting.com/punbb/viewtopic.php?pid=37076#p37076</guid>
		</item>
		<item>
			<title><![CDATA[Multiple units from single BOM]]></title>
			<link>https://frontaccounting.com/punbb/viewtopic.php?pid=37075#p37075</link>
			<description><![CDATA[<p>Hi Everyone,<br />My scenario is I use inputs to produce an item that will be broken down and used as an input further along the manufacturing process. Eventually I produce from 1 item up to 150 units of finished product.<br />So 10 item A + 5 item B + 10 item C = 24 item D. If the BOM module is structured to produce just one unit of the item then my BOM has to look like:<br />.4166667 item A + .208333 item B + .4166667 item C = 1 item D<br />I have done this before and it is inelegant and rounding can cause errors.<br />Is there any way to make the BOM read like the actual process:</p><p>10 item A + 5 item B + 10 item C = 24 item D</p><p>Then when I use item D I may take 5 item D + item E etc to produce Item F</p><p>In the actual scenario I am doing 90 + .33 + 2.5 +11&nbsp; = 90 so the decimals are very inelegant</p>]]></description>
			<author><![CDATA[null@example.com (kurt)]]></author>
			<pubDate>Sat, 29 Feb 2020 11:07:44 +0000</pubDate>
			<guid>https://frontaccounting.com/punbb/viewtopic.php?pid=37075#p37075</guid>
		</item>
	</channel>
</rss>