<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
	<channel>
		<title><![CDATA[FrontAccounting forum — Easy FA for manufacturing, skipping BOM / Work Order]]></title>
		<link>https://frontaccounting.com/punbb/viewtopic.php?id=7535</link>
		<atom:link href="https://frontaccounting.com/punbb/extern.php?action=feed&amp;tid=7535&amp;type=rss" rel="self" type="application/rss+xml" />
		<description><![CDATA[The most recent posts in Easy FA for manufacturing, skipping BOM / Work Order.]]></description>
		<lastBuildDate>Thu, 31 May 2018 11:44:46 +0000</lastBuildDate>
		<generator>PunBB</generator>
		<item>
			<title><![CDATA[Re: Easy FA for manufacturing, skipping BOM / Work Order]]></title>
			<link>https://frontaccounting.com/punbb/viewtopic.php?pid=31754#p31754</link>
			<description><![CDATA[<p>As you mentioned inventory adjustments - it can be an easy solution, if you really know what are you doing, including pricing calculations. In this case all production will be in the same stock location, like the used materials.<br />You have to decrease used materials items and increase manufactured items, all with corresponding prices.</p>]]></description>
			<author><![CDATA[null@example.com (stefan)]]></author>
			<pubDate>Thu, 31 May 2018 11:44:46 +0000</pubDate>
			<guid>https://frontaccounting.com/punbb/viewtopic.php?pid=31754#p31754</guid>
		</item>
		<item>
			<title><![CDATA[Re: Easy FA for manufacturing, skipping BOM / Work Order]]></title>
			<link>https://frontaccounting.com/punbb/viewtopic.php?pid=31753#p31753</link>
			<description><![CDATA[<p>Hi notrinos, thanks for your reply. But I was looking at the bigger picture </p><br /><p>Scenario :<br />------------<br />we are producing an item called <strong>candy</strong> and sell them all over the world. now, the component to make a candy consist of many things. <br />let&#039;s say, in this case there are only 3 components : <strong>sugar, malt,</strong> and <strong>coloring</strong> </p><br /><p><strong>Option A) to go with Manufacturing process</strong><br />Define work centers, create bill material (BOM): [component] sugar, malt, coloring =&gt; candy [finished goods] <br />for every single day your production unit produce candy </p><p><strong>Option B) journal it other way </strong><br />Is there a way in FA to do it skipping the normal Manufacturing process in Option A ? <br />Ok, now, why would you do that ? </p><p>The motivation behind this is that : for now, let&#039;s just say there are myriad factors to consider apart from <br />those 3 components and it&#039;s not easy to identify them and the effort to identify them completely would just<br />set us back for months. How would we go to address this scenario ? Is there a way where we can achieve the <br />result of <strong>Option A</strong>, like Inventory/C.O.G.S/labor cost etc but just skipping the Manufacturing process in FA ?</p>]]></description>
			<author><![CDATA[null@example.com (aleifuuwork)]]></author>
			<pubDate>Thu, 31 May 2018 08:28:15 +0000</pubDate>
			<guid>https://frontaccounting.com/punbb/viewtopic.php?pid=31753#p31753</guid>
		</item>
		<item>
			<title><![CDATA[Re: Easy FA for manufacturing, skipping BOM / Work Order]]></title>
			<link>https://frontaccounting.com/punbb/viewtopic.php?pid=31752#p31752</link>
			<description><![CDATA[<p>You seem to be talking about single-unit production, which has variable BOM per unit ?</p>]]></description>
			<author><![CDATA[null@example.com (notrinos)]]></author>
			<pubDate>Thu, 31 May 2018 08:07:03 +0000</pubDate>
			<guid>https://frontaccounting.com/punbb/viewtopic.php?pid=31752#p31752</guid>
		</item>
		<item>
			<title><![CDATA[Easy FA for manufacturing, skipping BOM / Work Order]]></title>
			<link>https://frontaccounting.com/punbb/viewtopic.php?pid=31750#p31750</link>
			<description><![CDATA[<p>Hi guys, </p><br /><br /><p>Following is discussion for FA team, or, I guess for accountants in general </p><p>We are loving FA as a whole system. A whole, because it&#039;s the only few open-source software that <br />covers all aspect of business that we have ( We are in manufacturing ! ). kinda like SAP level, but <br />very much less daunting and looks like way more flexible </p><p>Speaking of flexibility, is there a way to &#039;skip&#039; the usual Manufacturing process like setting up Bill <br />of Material/Work Order of the day etc to determine the COST OF GOODS SOLD / Inventory costing ? </p><p>This is, just because there are many factors that goes into manufacturing process that software may/may not <br />able to reflect real data like how we want it to be. Sure, we can have assumption and the likes but We would<br />love to know if we can &#039;skip&#039; altogether it and use other way to determine COGS/Inventory part ? <br />( via daily inventory adjustment ... For example ) </p><br /><p>Many many thanks team<br />Keep up the good work </p><p>Cheers,</p>]]></description>
			<author><![CDATA[null@example.com (aleifuuwork)]]></author>
			<pubDate>Thu, 31 May 2018 07:28:38 +0000</pubDate>
			<guid>https://frontaccounting.com/punbb/viewtopic.php?pid=31750#p31750</guid>
		</item>
	</channel>
</rss>
